Why dust on a transformer becomes a risk
In the operating instructions for its cast-resin transformers, Siemens Energy names dust and dirt as the main causes of transformer overheating; they also increase the risk of a short circuit. Heavy contamination can lead to partial discharge and tracking; in high humidity, this can happen even with light contamination. That is what SGB-SMIT states in its operating instructions. Foreign objects such as screws or metal chips damage the windings when the transformer is energized and can cause flashover and fire. A cast-resin transformer is cooled by room air that flows up from below through the ducts between the windings. Cleaning here is not about appearance. It is about insulation and operational reliability.
What we clean
- Cast-resin (cast coil) transformers: We remove dust and deposits from the winding surfaces, the winding area, insulators and connections, and the inside of the enclosure.
- Coil cooling ducts: We clean the cooling ducts and the spaces between the windings with particular care, as the manufacturers specify.
- Oil-filled transformers: We clean the external surfaces: tank, radiators (cooling fins), bushings and the surrounding area.
- Transformer rooms: Depending on the job, we also include the transformer room or vault with its floors, cable trays and ventilation openings. Read more in our article Cable tray cleaning.
De-energized only: who does what
Despite the cast-resin insulation, the windings of a cast-resin transformer are not safe to touch. The manufacturer SGB-SMIT calls it functional insulation and requires the windings to be treated as exposed live parts. Under the German accident insurance regulation DGUV Vorschrift 3, work on energized parts is generally prohibited. The standard procedure is to establish a de-energized state using the five safety rules:
- Disconnect
- Lock out and tag out to prevent re-energizing
- Verify the absence of voltage
- Ground and short-circuit
- Cover or barricade adjacent energized parts
This is done by the facility's qualified electrical personnel. They disconnect and lock out the equipment and release the work area to us. Our team cleans within this release, under the direction and supervision of the qualified electrical personnel. We start only once the work area has been released and the transformer surfaces have cooled as far as the manufacturer specifies: below 40 °C (104 °F) for SGB-SMIT, below 55 °C (131 °F) for Siemens Energy. We do not clean energized equipment.
One transformer at a time
Power distribution in data centers is usually redundant. One transformer at a time can then be de-energized without taking down the IT. Timing, lockout and scope are agreed in advance with the facility's qualified electrical personnel.
It is most economical to schedule the cleaning during a planned outage, for example for maintenance or testing.
How we clean
- Dry cleaning as standard: We vacuum with H14 HEPA vacuums and clean with soft brushes and dry, lint-free wipes. For light, dry dust, this is exactly what SGB-SMIT specifies: dry cloths and soft brushes.
- Cleaning agents only as the manufacturer specifies: Requirements differ from manufacturer to manufacturer: SGB-SMIT rules out water, wire brushes, steel wool and non-polar solvents such as gasoline or mineral oil, and Square D rules out liquids, solvents and detergents. Siemens Energy, on the other hand, allows a cloth with a surfactant-based cleaner followed by a dry wipe. We therefore use cleaning agents only if the manufacturer's instructions specify them. If no agent is specified, we clean dry.
- Metal debris: We also pick up steel chips and loose steel parts with magnets. A magnet does not attract copper or aluminum chips; those are vacuumed up.
- Compressed air: only where the manufacturer's instructions allow it. SGB-SMIT allows compressed air for light, dry dust in hard-to-reach spots. Square D and Hammond recommend vacuuming first and limit the pressure to 25 psi. We use filtered, oil-free and dried compressed air with simultaneous extraction through an H14 filter.
Handover before re-energizing
- No foreign objects: Tools and materials are completely removed. No screws or metal chips remain on or between the windings, in the cooling ducts or in the enclosure.
- Dry and clear: The transformer, fans and enclosure are dry, and the air inlets are not blocked.
- Findings reported: We photograph discoloration, cracks, tracking or signs of partial discharge and report them to the person responsible for the equipment. The evaluation is up to the qualified electrical personnel.
- Re-energizing: The facility's qualified electrical personnel inspect the equipment and re-energize it.
How we document work and findings is described on our page Documentation & reporting.
When transformer cleaning makes sense
- At the maintenance interval: Manufacturers generally call for annual maintenance. Siemens Energy recommends cleaning once a year, or several times a year with increased contamination. For its cast-resin transformers, SGB-SMIT recommends a first inspection after six months at the latest; the maintenance interval must not exceed one year. In dusty environments, Square D and Hammond call for inspections every three or six months.
- After construction and renovation work and before commissioning: when it is energized, the transformer must be dry and free of dust and foreign objects. Read more under Pre-commissioning cleaning.
- When dust becomes visible, for example on the windings, at ventilation openings or in the transformer room.
What does transformer cleaning cost?
That depends on the number, type and size of the transformers, the level of contamination, access and the outages required. After a free on-site survey, you receive a quote.
Specialized company from Wehrheim near Frankfurt
COM.SAR IT Cleaning is a specialized company based in Wehrheim in the Taunus region, close to the data center hub of Frankfurt am Main. From here we work across Germany, Austria and Switzerland. The work is carried out mainly by our own employees. All of them are background-checked (German Führungszeugnis) and receive ESD fundamentals training in accordance with IEC 61340-5-1. Our general liability insurance covers bodily injury and property damage up to 10 million euros.
Sources
- DGUV Vorschrift 3 “Elektrische Anlagen und Betriebsmittel” (German accident insurance regulation on electrical installations and equipment), with implementation instructions (§ 6, § 8).
- DIN VDE 0105-100 (VDE 0105-100), Operation of electrical installations (five safety rules).
- SGB-SMIT: Betriebsanleitung SGB-Gießharztransformatoren (operating instructions for SGB cast-resin transformers), Doc. No. 02.07.00-11.002 DE, Rev. I, 2024: safety, planning notes, maintenance and cleaning.
- Siemens Energy: GEAFOL/CARECO cast-resin transformers, operating instructions, edition 08/2026: inspection, maintenance and cleaning.
- Schneider Electric (Square D): Dry-Type Transformers, 1000 Volts and Below, Class 7400, Instruction Bulletin 43006-850-01, 01/2025: maintenance and cleaning.
- Hammond Power Solutions: Installation, Operation, and Maintenance Guide – HPS EnduraCoil Cast Resin Transformers (IOMGCAS), May 2014: maintenance and cleaning.