Before commissioning: cleaning a data center designed for 56 MW
Approximately 25,000 m² (about 269,000 sq ft), twelve team members and extensive electrical and mechanical infrastructure: between 2023 and 2026, COM.SAR IT Cleaning carried out the construction-phase cleaning of the sensitive areas (white space and gray space) of a newly built data center before commissioning. The facility was designed for a capacity of 56 megawatts.
- Design capacity
- 56 MW
- Area cleaned
- Approx. 25,000 m²
- Team
- 12 members
- Project period
- 2023–2026
From rack areas to equipment interiors
The scope covered the data halls and the associated power, cooling and other MEP infrastructure. It included rack areas, hot and cold aisles, cable trays and electrical and mechanical rooms, as well as medium- and low-voltage switchgear (MV/LV), switchboards and panelboards, transformers, UPS systems, distribution equipment and CRAH units. Interior cleaning of the listed technical equipment and systems formed part of the project. The work therefore extended from room surfaces and infrastructure to internal equipment areas.
Working around construction progress
The main organizational challenge was the dependency on other trades. Many areas could only be cleaned once preceding construction and installation work had been completed. When those activities fell behind schedule, cleaning dates and work sequences had to be adjusted.
Working at heights and changing site conditions
Ongoing construction, tight schedules and difficult access required flexible planning. Working at heights presented a particular challenge. Access arrangements, suitable equipment and the existing airflow also had to be considered during the work. The twelve-person team worked through the areas as construction progressed, adapting the cleaning program to changing site conditions and the approaching handover.
Documented completion and handover
Following completion of the cleaning, the data center was handed over to the operator. Particle count testing for ISO Class 8, cleaning records and photos documented the work performed. Acceptance took place during a joint walk-through with the client. This project illustrates the breadth of comprehensive data center cleaning, from rack areas and cooling equipment to electrical infrastructure. It also demonstrates the importance of organizing the work across multiple construction phases and responding to changes in the construction schedule.
The client and location remain confidential.