Not a general construction cleanup
A construction site goes through several rounds of cleaning. Rough and interim cleans that remove debris and coarse construction dust, as well as cleaning of offices, corridors and outdoor areas, are usually handled by a commercial cleaning company. We come in at the end: for the technical deep cleaning of the areas where IT equipment and electrical and mechanical systems will later operate, often called the white-glove clean. This includes the plenum beneath the raised floor, overhead cable trays, racks, and switchgear, UPS systems and cooling units, including their interiors on request. This work requires an understanding of IT, an ESD-safe approach and vacuums with H14 HEPA filters.
Why a new data center has to be clean before energization
Every construction site produces drilling dust, grinding dust, fibers and packaging residue. Whatever is left in raised floors, cable trays, switchgear or cooling units is spread throughout the room by the cooling system once everything is switched on. Many server and storage manufacturers require air cleanliness to ISO Class 8 under ISO 14644-1 for their equipment. The deep cleaning therefore needs its own slot in the construction schedule.
What we clean
- Data halls: rack areas, hot and cold aisles and raised floors with their subfloor plenum, understructure and panels (see Raised floor cleaning).
- Cable trays and other installed utilities, including overhead.
- Electrical systems: medium- and low-voltage switchgear, switchboards and panelboards, transformers, UPS systems and distribution equipment. We clean the inside of switchgear only when it is de-energized and locked out. De-energizing, lockout and release for work are handled by the operator's qualified electrical personnel.
- Cooling equipment: CRAH and CRAC units.
- Interiors of equipment and systems, where agreed and approved.
Area by area, as soon as the trades have finished
An area can only be deep-cleaned once all work there has been completed. If trades finish later than planned, our visits shift as well. We therefore coordinate dates continuously with the construction manager and the trades. We protect cleaned floors with coverings during subsequent work.
Renovation while IT equipment stays live: dust control first
When an existing data center is renovated, we first protect the live IT equipment from construction dust. Dust containment enclosures, dust barriers, airlocks and, where needed, temporary positive-pressure zones with HEPA-filtered supply air are available for this. We build enclosures ourselves, with a wood or aluminum frame depending on the hazard level. After the construction phase come deep cleaning, removal of the protective measures and acceptance. More on this under Maintenance & prevention.
Working at heights and safety on site
- Height: We reach cable trays and high equipment areas with aerial lifts. Our team members hold the IPAF PAL Card for vertical lifts such as scissor and mast lifts (MEWPs, category 3a). We prefer to use lifts that are already available on site or at the client's facility. Otherwise, an equipment rental company provides them.
- Protective equipment: On construction sites, we wear PPE in line with the requirements on site.
- Team: Our staff, mostly our own employees, are background-checked (German Führungszeugnis) and have completed ESD fundamentals training in accordance with IEC 61340-5-1. The same applies to subcontractors.
- Cleaning: We vacuum with H14 HEPA filters and capture dust in a controlled way instead of stirring it up.
Documented handover
At completion, we document the work with cleaning records and photo documentation. On request, we test air cleanliness to ISO 14644-1 with an ISO Class 8 target (see Particle count testing). Acceptance takes place during a joint walkthrough with you. More about our reports under Documentation & reporting.
Case study: new build designed for 56 MW
Between 2023 and 2026, COM.SAR IT Cleaning carried out the construction-phase cleaning of the sensitive areas of a newly built data center. The facility was designed for a capacity of 56 megawatts. The twelve-person team cleaned approximately 25,000 m² (about 269,000 sq ft), from rack areas to transformers, UPS systems and CRAH units. The client and location remain confidential.
Read the case studyHow pre-commissioning cleaning works
- On-site survey and construction schedule: clarify areas, access, dates and contacts.
- Quote: based on areas, systems, heights and cleaning scope.
- Deep cleaning area by area, as soon as the trades have finished, coordinated with the construction manager.
- Completion before commissioning.
- Handover: records, photo documentation, particle count testing on request, final walkthrough and sign-off.